Fishers say P 18.5 B Laguna Lake rehab plan a bailout to big business

By Billy Javier Reyes and Gerry Albert Corpuz

Manila, Philippines- Leaders of the fisherfolk alliance Pambansang Lakas ng Kilusang Mamamalakaya ng Pilipinas (Pamalakaya) and Save Laguna Lake Movement (SLLM) on Saturday said the P 18.5 billion budget set aside by the National Economic Development Authority (NEDA) for the rehabilitation of the calamity stricken Laguna Lake is a bailout for companies conducting business operations around the lake.

In a press statement, Pamalakaya national chair and SLLM convener Fernando Hicap said the rehabilitation plan appeared like a bailout for factories and industrial plants which will benefit from the construction of 5 lakeshore areas for wastewater treatment facilities and 4 sewage treatment plants.

“The cruel intention of Malacanang is to carry out the rehabilitation of big business affected by storm Ondoy. Now it appears to us that this rehabilitation project is nothing but a major bailout for all-time profiteers and exploiters and not for lakeshore people seeking a comprehensive pro-people rehabilitation plan in Laguna Lake,” added Hicap.

The P 18.5 billion Laguna Lake rehabilitation project aims to resolve flooding problems in the provinces of Rizal and Laguna province. Based on the initial plans of NEDA, the government will implement the dredging of the Laguna lake navigational lane and the entire 8-kilometer stretch of the Napindan channel.

The rehabilitation plan also includes the development of transport systems and service repair centers. Specifically, the program targets to build 12 ferry stations in several sites. The NEDA said the Laguna de Bay rehabilitation project is set to be implemented from 2010 to 2012.

The Pamalakaya leader also lambasted the plan of the government to borrow loans for the rehabilitation project, asserting that the project is meant to assist big corporations, but the Filipino taxpaying public will be the one to pay for the loans to be sourced from Belgian government under the Belgian’s Super Subsidy Program and other Belgian private banks.

“The loans from Belgian financial biggies which will be used for the water treatment facilities and transport needs of big businesses in Laguna Lake will be paid by the Filipino taxpaying public. Where is social justice here?” asked Hicap.

Earlier, leaders of various people’s organizations in Laguna Lake had agreed to file criminal and administrative charges against President Gloria Macapagal-Arroyo and Laguna Lake Development Authority (LLDA) chair Edgar Manda before the Office of the Ombudsman, whom they blamed as masterminds behind Laguna Lake’s swallowing of more than 30 towns in Rizal, Laguna and parts of the National Capital Region.

Since last week, leaders of Pamalakaya and SLMM had been conducting formal and informal consultations among fishermen, farmers and urban poor groups in Laguna Lake on the filing of class suit and other appropriate charges against President Arroyo and Mr. Manda. They asserted that the continuing closure of Napindan Hydraulic Control Structure (NCHS) was the immediate cause why majority of towns along Laguna Lake were and are still submerged to 14.5 meter deep since typhoon Ondoy stormed the country on Sept.26.

“The collective sentiment of the people in Laguna Lake is loud and clear– they hold the Office of the President and LLDA responsible for this across-the-lake calamity, and they want to bring them to court and to the court of public opinion,” Pamalakaya said.

The fisherfolk group had also consulted advocacy groups based in Metro Manila who are also organizing urban poor, women and worker groups along Laguna Lake about their plans to charge President Arroyo and Mr. Manda before the Office of the Ombudsman. Pamalakaya said the response was very positive and the filing of case against Arroyo and Manda may take place before the end of November.

“The Laguna Lake people in particular and the Filipino people in general have a case against Arroyo and Manda, and this will be billed in contemporary history as People of the Philippines versus President Gloria Macapagal-Arroyo and LLDA general manager Edgar Manda,” said Pamalakaya.

Pamalakaya said aside from Arroyo, other government officials will also be included in the charge sheet, but the Pamalakaya leader said they will reveal the names on the eve of the filing of charges against the President and the LLDA general manager.

Pamalakaya said aside from filing criminal and other appropriate charges, it will join forces with SLMM in the signature campaign calling for the immediate and unconditional dismantling of NCHS. The group said fisherfolk leaders and environmental activists have committed to initiate the campaign and gather signatures that will press the immediate removal of the controversial structure constructed in 1983.

The NHCS was built in 1983 to prevent or lessen the increase of salinity from Manila Bay and pollution from the Pasig River from entering Laguna de Bay during times of reverse flow. The NHCS is found on the confluence of Marikina and Pateros-Taguig rivers with Pasig River. This confluence is also the downstream endpoint of the Napindan Channel, which is the upper part of Pasig River that connects to Laguna de Bay.

Aside from preventing the reverse flow of Pasig River, the NHCS is also used for flood control. During the rainy season, most of the flooding along the Pasig River area is due to the increased water flow coming from Marikina River.

The Manggahan Floodway in Pasig City was constructed to divert much of this water from Marikina River directly into Laguna de Bay. By also closing the NHCS during times of rain, the water is effectively dammed in Laguna de Bay preventing it from flooding the downstream portions of Pasig River.lippines-

Leave a comment

Filed under corruption, disaster, environment, Laguna Lake, politics

Leave a comment